Move one week down a calendar column
This lesson uses a finite model to practise move one week down a calendar column and checks every stated constraint.
The video could not load. Check your connection and try again, or download it directly.
Download video
Open Chinese transcript
- 示意日历每一行连续排七天。十二日在第二行第一格,我们要找它正下方的日期。
- 从一个格子竖直往下,列没有改变,但跨过了完整的一行,也就是七天。
- 十二再过七天是十九,所以十二日下方应当写十九日。
- 画面里十二和十九在同一列,中间没有向左或向右移动。
- 答案是十九日。用加法检查,十二加七等于十九。
- 日历同列上下相邻通常相隔七天;这来自本题每行七天的排列。横向相邻才只差一天,不能混用。
Sources for this explanation
Logical thinking
Record the conditions, apply the finite method, and substitute the result back into the original problem.
Worked example
A calendar has 7 consecutive days per row. What date is directly below the 12th?
A calendar row contains seven consecutive dates. Moving one cell straight down adds 7, so 12+7=19.
Try one question
The next cell down is seven days later, and 8+7=15.